Skip to content
CBV360

Case 01 / Ontario engineering

Maya sees a better way to manage stormwater.

A young engineer wants to help build neighbourhoods that cope better with heavy rain. A recurring flooding concern gives her an immediate question and a longer career direction.

Illustration of rain, a neighbourhood street and alternative drainage pathsIllustrated portrait of Maya, the fictional engineer

Maya and the situation are fictional composites. This is an educational example, not a design recommendation or PEO approval of any resource. Maya has held her P.Eng. licence since 2024 and is practising in 2026; a first-calendar-year licensee would be exempt from that year's PEAK program.

01 / CREATE

Start with the question, not a course.

After a heavy-rain event, Maya hears that a low-lying route near a school has flooded again. She wants to grow from checking calculations to helping teams design more resilient streets. She does not treat the anecdote as design data. She asks: How could a future street renewal reduce runoff risk without shifting it downstream?

She sketches several possibilities and names her learning gaps: local design criteria, runoff and inlet behaviour, maintenance trade-offs, and how to explain uncertainty. Before touching a real project, she confirms scope, supervision, municipal criteria, and the responsible engineer’s review process.

Try the Create prompts ↗
02 / BUILD

Learn for both the work and her future role.

Maya checks her own 2026 PEAK status and assigned target in PEO’s portal. Practice Evaluation and the Professional Practice Module are separate required steps; a course or site worksheet cannot replace them. She then creates a focused reading and mentoring plan around stormwater design and professional judgment.

  1. Read Ontario’s stormwater planning manual for the local planning and design context, while checking current municipal and approval-agency criteria.
  2. Study relevant sections of FHWA’s 2024 urban drainage manual for technical methods. It is a US reference, not an Ontario code.
  3. Discuss one anonymized design question with a qualified mentor and record the learning, actual time, and relevance to her practice.

PEO says a licence holder assesses each activity individually. Only admissible learning time is reported; ordinary professional practice work is not CPD. Maya keeps her source notes and any proof herself, then reports through PEO’s portal if the activity qualifies.

Explore the training catalogue ↗
03 / VISUALIZE + VALIDATE

Picture an option, then test the assumptions.

Maya imagines two alternatives for a hypothetical street segment: a conventional inlet layout and a design with additional distributed controls. She writes down what each would need to achieve: manage water quantity and quality, be maintainable, and meet the governing local criteria. She asks her supervisor what evidence would make a comparison credible.

For a real assignment, the team would use site data, appropriate methods, municipal and conservation-authority requirements, and responsible review. Maya’s learning helps her ask better questions, but it does not authorize her to practise beyond her competence. A small, reviewed comparison can reveal the next gap: perhaps maintenance assumptions, cold-climate performance, or stakeholder communication.

Career result: She can now explain a bounded learning plan and a reviewable decision path. Her next ambition is to lead a carefully supervised pilot, not to claim that one course made her an expert.

Try the validation prompts ↗

Source trail · checked 21 November 2026

The references behind Maya’s choices

These are free, public starting points for each stage of the case. Their inclusion does not make an activity PEO-admissible or make a US method applicable in Ontario. Check current local rules before real engineering work.

CREATE · METHOD

Design Council: Double Diamond

Use Discover and Define to separate what people experience from an assumed solution. This is an ideation method, not an engineering standard.

BUILD · PEO PRACTICE

Practice guidelines

Find guidance on responsibility, competence, and practice questions.

VALIDATE · ONTARIO APPLICATION

Preparing a stormwater report

Shows the need to establish criteria using site assessment and applicable authorities.

VALIDATE · MONITORING

Operation, maintenance and monitoring

Use the Ontario manual to ask what a design would need to demonstrate over time, including inspection and maintenance. Check current local criteria.

BUILD · COMING CHANGE

2027–28 CPD changes

Plan for the transition without applying announced future rules to a 2026 report.

Review these links and PEO program details again before 2027. A resource’s date and location are distinct from its usefulness; local governing criteria take precedence for actual work. Independent Ontario stormwater practitioner review of this illustrative case remains open.

What the cycle changed

A broader vision with a responsible next move.

Maya did more than collect hours. She connected a public need to a career goal, found relevant learning, and framed a test her team could review. The result could send her back to revise the comparison, or begin a related cycle around maintenance, cold-climate performance or communication—with appropriate supervision and review.

See all case directions ↗